Taking leave …
September 26th, 2005 at 7:27 pm by jamesI’m in pain. I’ve laid two thirds of the floor and filled the whole dastardly crack. “Filled” sounds so reasonable and straightforward. I have, in fact, beaten it into gaping submission with a cold chisel and hammer, scoured it out with a wire brush, sprinkled it lovingly with water to improve the bond, then filled it with a mortar mix and tried to make it level. All whilst crouching down in a manner clearly never anticipated by the designer of my jeans …
So why is it that I took My Good Wife’s advice and got someone in to do the deck, but insisted on doing the floor myself? It’s possible I never needed to know there was a crack under my living room floor. And of course, I could have done something else with two days of holiday …
Next time I do this remind me not to. Oh yes, there will be a next time.
September 28th, 2005 at 4:58 pm
You seem quite attached to the Crack in the Floor. What a shame to cover it up after forging such a close and loving relationship.
September 28th, 2005 at 4:58 pm
says me, Anna
September 28th, 2005 at 9:41 pm
you leetle keeder you 😉
I will finish the floor tomorrow.